Commercial Construction: Toyota Buffer Yard Expansion

Hebron, Kentucky

The scope of work included the following:

  • Excavating/grading, including 30,000 CY of imported dirt fill
  • Storm sewer – approximately 1,495 linear ft. of piping structures (manholes, catch basins, headwalls)
  • 6” underdrain at edge of pavement
  • Utilities – underground electric run for light poles
  • Paving – 800 cu. yd. of concrete for dolly pads (the areas where truck trailers place their landing gear) / 390,000 sq. ft. of heavy duty asphalt pavement (10” of DGA base, 6” of asphalt base course, 1.5” of asphalt surface course)
  • 2,350 linear ft. of K-Rail (jersey barriers) at the rear of all the trucks stalls
  • Security fence and guardrail
  • Landscaping buffers planted at the property line (approximately 65 trees)

Construction Duration
5 months

Project Size
601,128 sq. ft. of total disturbed area during excavating and grading
390,000 sq. ft. of paving

Project Cost
$3.2MM

Owner
Toyota Motors North America
Toyota NAPCK Facility
3675 North Bend Road
Hebron, KY 41048

Architect
BHDP Architecture, Inc.
302 West 3rd Street, Suite 500
Cincinnati, OH 45202

Location
3675 North Bend Road
Hebron, KY 41048