Commercial Construction: Duke Energy Queensgate Chiller Replacement

Cincinnati, Ohio 

The scope of work included the following:

  • Furnished and installed new chiller
  • Rebuilt existing chiller to manufacturers specification
  • Installed two water pumps, VFDs, operating control system with refrigerant leak detection system.

Construction Duration
5 months

Project Cost
$1 million

Owner
Duke Energy
PO Box 1007
Charlotte, NC 28201

Architect
ThermalTech Engineering
3960 Red Bank Road
Cincinnati, OH 45277

Location
424 Gest Street
Cincinnati, OH 45201